April 9, 2014 Annual Road Tour and Meeting

Road Tour Meeting
4/9/2014
Madge Town Hall

Chairman, Mike Baker, called the road tour meeting to order. Board and clerk were present.

Roads:
1st Street – Good
Baker – Crack fill east of Todd to Cty B
Baker (west) – New surface – shoulder gravel Cty M to Todd
Chinty Landing - Good
Cipra – Some gravel
Cook – Needs stop sign
Deep Lake – Cracks to be filled – Chip Seal / Stop sign east corner of 4-way
Deep Lake Boat Landing – Gravel needed for washout
Devils Lake – Chip seal sometime – patch holes on hill
Devils Lake Landing –
Evergreen – Good
Fenander – Crack fill
Golf – Crack fill / Chip seal
Gort – New surface needed (Blacktop overlay)
Hanks Landing – Graded
Hagen – Patch hole
Harmon – Patrol needed
Harmon Landing – graded
Hendrickson – Needs blacktop overlay
Hess – Grading
Jesse – Crack fill / Chip seal / Gravel needed towards landing & sandhole
Kirby – Good
Lakeview – Blacktop from Corner to the dead end / Patching
Langland – Needs gravel on 2 curves
Leesome – Gravel – Shaping – Culvert on west end
Leesome Lake Landing –
Moody – Crack fill and chip seal
Moody Lake Landing – Gravel
Morningside – Chip seal / crack fill – Gravel on the joint part with Long Lake Township
Rockford – Fog seal – Rocks need to be pushed off blacktop
Rockford Landing – OK
Soholt – Good
Spur – Gravel
Todd Park – Chip seal and crack fill
Todd – North – Crack fill
Todd – South – Good
Todd Landing –
Warren – crack fill / Chip seal
Wildwood – crack fill / Chip seal
Winselman – Trees & banks – Joint with Long lake Township
Wohlford – Gravel in low spots



Possible 2014 Projects

Chip seal / Crack Fill – Warren, Wildwood, Golf, Todd Park Roads or;
2 miles around Deep Lake
Lakeview Road – Pulverize, Shape, add gravel, shape, new blacktop

Gort Road – Sweep and do Blacktop overlay

Route and crack fill – Baker Road from Todd to Cty B
Crack fill – Todd Road from Baker to Cook Rd.


Mowing – all town roads

Brushing – To be determined



5yr plan: (From 2013 meeting)
(2014) Lakeview Road; (2015) Leesome Road from Fenander to County M (2016) ?



Meeting adjourned at 6:40 pm


Archive:

April 10, 2019 Town Board Meeting
April 7, 2019 Road Tour Minutes
March 13, 2019 Town Board Meeting
February 13, 2019 Town Board Meeting
January 9, 2019 Town Board Meeting
December 12, 2018 Town Board Meeting
November 12, 2018 Town Board Meeting
October 10, 2018 Town Board Meeting
September 12, 2018 Town Board Meeting
August 8, 2018 Town Board Meeting


View all from: 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008

Town of Madge, Washburn County, Wisconsin
N3296 Langland Rd, Sarona, WI 54870
Tel. 715-469-3439
© 2019 | Site Index | Disclaimer
Designed & Hosted by Town Web Design, Inc.