April 12, 2015 Annual Road Tour / Meeting

Road Tour Meeting
4/12/2015
Madge Town Hall

Chairman, Mike Baker, called the road tour meeting to order at 4:20 pm. Mike Baker, Jerry Nielson & Kevon Cronk and Clerk Michelle Jung present.

Roads:
1st Street – Potholes need fill
Baker – Brushing, Culvert, at the end on North side by West field, needs to be replaced.
Baker (west) – Chip seal (2014)
Chinty Landing – Garbage – Outhouse needs toilet seat, plastic front for light, vent pipe
Cipra – Gravel – 8 loads
Cook – Gravel – 10 loads – Stop sign
Deep Lake – Chip seal – Swept – Culvert bump – Stop sign on spur, south of landing
Deep Lake Boat Landing – Good
Devils Lake – Holes at the end need to be cut and patched
Devils Lake Landing –
Evergreen – Gravel at the end – 2 loads
Fenander – Garbage – Sweep the hill – Curve sign tipped over – Hole in the shoulder
Golf – Chip seal (2014)
Gort – Blacktop (2014)
Hanks Landing – Culvert – TV to be removed
Hagen – Good
Harmon – Gravel, Todd intersection, East and West of this intersection – 25-30 loads – Stop
ahead sign is twisted
Harmon Landing – Good
Hendrickson – Chip seal in the future
Hess – Gravel – 15-20 loads – Road sign gone
Jesse – Gravel – 10 loads - Brushing
Kirby – Gravel by the intersection with Moody – 2 loads
Lakeview – Chip seal (2014)
Langland – Curve sign – Gravel by the 1st curve – 2 loads
Leesome – Brushing – Gravel – 40-50 loads ¼ mile by Moody intersection, East of culvert
replacement, between camp & Cty M – LL1 culvert needs replacement
– Blacktop in future
Leesome Lake Landing –
Moody – Gravel – 15 loads by Lamperts, Spur rd, before hill.
Moody Lake Landing – Good
Morningside – Chip seal (2014) – Gravel – 40 loads, shaping – ½ mile joint project
Rockford – Fog seal in future – Washout by Rockford House – 25 MPH sign replaced
Rockford Landing – Good
Soholt – Brushing – Center line – Dead end and Stop signs need replacement
Spur – Gravel – 8 loads, by intersection
Todd Park – Chip seal (2014) – Dead end road sign replaced
Todd – North – Paver patch needed – Center line – Chip seal North of Baker
Todd – South – Center line
Todd Landing –
Warren – Chip Seal (2014)
Wildwood – Chip Seal (2014) – Culvert plugged
Winselman – Gravel – 6 loads, Joint project
Wohlford – Gravel – 8 loads – ATV/Snowmobile sign



2015 Work Needed

Chip Seal Projects from 2014 – Baker, Golf, Lakeview Drive, Morningside, Warren, Wildwood, Todd Park Roads

Overlay from 2014 – Gort Road

Gravel – Cipra (8), Cook (10), Evergreen (2), Harmon (25-30), Hess (15-20), Jesse (10), Kirby (2), Langland (2), Leesome (40-50), Moody (15), Morningside (40), Spur (8), Winselman (6), Wohlford (8) Total Loads of gravel – 211 Loads

Culverts – Baker, Hanks Landing, Leesome Lake (LL1), Wildwood (Plugged)

Pot Holes / Patching – 1st Street, Devils Lake Road, Todd Road North, Rockford Road

Signs – Cook, Deep Lake, Fenander, Harmon, Hess, Langland, Rockford, Soholt (2),
Todd Park, Wohlford

Mowing – all town roads

Brushing – Baker, Jesse, Soholt, Leesome

Chip Seal – Deep Lake Road, Todd North, Hendrickson (In Future)

Garbage – Chinty Lake, Fenander, Hanks Landing

Shoulder Work – Fenander,

Center Line – Soholt, Todd (North), Todd (South)

Swept – Deep Lake, Fenander,

2015 Possible Projects – either Chip Seal Deep Lake Road or do the 211 loads of gravel

5yr plan:
(2016 - 2018) Leesome Lake Road 2.1 miles – will take 3 years, 2019 -
2020 -



Meeting adjourned at 5:15 pm


Archive:

August 7, 2019 Special Town Board Meeting
July 10, 2019 Town Board Meeting
June 12, 2019 Town Board Meeting
May 8, 2019 Town Board Meeting
April 10, 2019 Town Board Meeting
April 7, 2019 Road Tour Minutes
March 13, 2019 Town Board Meeting
February 13, 2019 Town Board Meeting
January 9, 2019 Town Board Meeting
December 12, 2018 Town Board Meeting


View all from: 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008

Town of Madge, Washburn County, Wisconsin
N3296 Langland Rd, Sarona, WI 54870
Tel. 715-469-3439
© 2019 | Site Index | Disclaimer
Designed & Hosted by Town Web Design, Inc.